
Osisko Gold Group Inc. is advancing the fully-permitted, construction ready, feasibility-stage Cariboo Gold Project in British Columbia:with significant pre-construction work already underway, 2.07 million ounces of reserves at a 3.62 g/t grade, funded and on a de-risked path to construction.
UA92 Uranium Project
Karoo Basin, Botswana
Confidential • For Investor Use


.png)




The Cariboo Gold Project received its permits on November 20, 2024, following its Environmental Assessment Certificate in 2023. Cariboo sits in a limited universe of permitted, development-stage gold assets of scale in Tier 1 jurisdictions.

Based on the 2025 feasibility study the Cariboo Gold Project envisions a 10-year mine life with after-tax NPV5% of C$943M, and IRR of 22.1%, at base case gold price of $2,400/oz (C$3.25B and 51.9% IRR at $4,500/oz gold) with production of up to 223 koz/yr and US$1,157/oz AISC.*

More than US$1.1 billion has been raised since securing project financing, including a US$450 million (US$350 million undrawn) financing facility with Appian Capital Advisory, funding the path toward a final investment decision and construction.

Two prospective mineralized trends over 83 km of strike, roughly 700 km drilled since 2015, and an average deposit depth of only ~350 metres, leaving significant room for resource conversion and exploration growth, plus a second 100%-owned asset at Tintic, Utah.
Built for clarity in under 5 minutes

Why a small number of gold projects in safe jurisdictions have become so hard to replace.

What it actually takes to move a project from permitted to shovel-ready, and exactly how far along this one is.

The parameters and assumptions behind the completed 2025 feasibility study.

How the project got fully funded, and the names that backed it. And the near-term milestones worth watching next.


.png)
.png)
.png)
.png)

A quick look at the company’s core profile.

Chair & CEO



Gold is being treated differently than it was a cycle ago. As central banks keep accumulating and geopolitical risk climbs, the market is separating gold that already flows from stable countries from everything else. The projects that can actually add new supply in safe jurisdictions sit right at the center of that shift.
.png)

.png)

Get clear, transparent updates as Osisko Gold Group Inc. advances its fully permitted Cariboo Gold Project through 2026 infill drilling and ongoing pre-construction.